Question 1

The owner of a newly formed plumbing LLC holds an active Utah Master Plumber license. The LLC has no contractor license and wants to bid a $48,000 commercial repiping project. The owner says, 'My license covers the company because I will supervise the work.' What must be in place before the LLC submits its bid?

Show answer & explanation

Correct answer: B - An appropriate plumbing contractor license issued in the LLC's name.

Question 2

A homeowner qualifies for Utah's owner-builder exemption while constructing a home for personal use. The homeowner hires an unlicensed neighbor at normal market wages to install new drain and vent piping and will personally direct the work. The homeowner has obtained the required permits. How does the exemption affect the neighbor's need for plumbing licensure?

Show answer & explanation

Correct answer: A - The paid neighbor does not acquire the owner's exemption from plumbing licensure.

Question 3

The sole qualifier of a Utah plumbing contracting company left 18 days ago. The company, licensed for two years, notified DOPL in writing six days after the departure and continues to satisfy its other licensing requirements. A replacement has not yet been appointed. Which statement accurately describes the company's license during this transition?

Show answer & explanation

Correct answer: B - It remains in force, with replacement required within 60 days of the qualifier's departure.

Domain 2: Plumbing Specific Regulations

Question 4

For one workweek, payroll has already paid a covered, nonexempt plumber straight time for 30 hours of rough-in work at $24 per hour and 18 hours of service work at $40 per hour. Both assignments are for the same employer. There are no other payments affecting the regular rate and no alternative overtime agreement. How much additional overtime premium is owed?

Show answer & explanation

Correct answer: C - $120

Domain 3: Other State Regulations

Question 5

Utility marks for a plumbing excavation are refreshed under a Blue Stakes Re-Mark request. The original locate ticket is still valid, but excavation will continue beyond its listed expiration. No Update request has been submitted. What did the re-mark change?

Show answer & explanation

Correct answer: C - It restored the markings; the ticket's original expiration still governs.

Domain 4: Labor Laws

Question 6

During a commercial retrofit, a second-year licensed apprentice installs piping on the second floor while the supervising licensed journeyman works on the third floor of the same project. The journeyman assigns the work, provides direction, and inspects and evaluates the installation. Does their separation by one floor, by itself, violate Utah's immediate-supervision rule?

Show answer & explanation

Correct answer: B - No; on-site supervision does not require a continuous direct line of sight.

Domain 5: Safety Reporting Requirements

Question 7

A competent person's visual and manual analyses identify cohesive clay with an unconfined compressive strength of 1.9 tons per square foot. The soil is fissured, with no freely seeping water, submerged material, or adverse layering. The excavation will remain open for one shift. Which interpretation correctly applies OSHA's soil-classification criteria?

Show answer & explanation

Correct answer: D - The soil is Type B because fissures disqualify otherwise Type A-strength soil.

Question 8

An entrant becomes unresponsive during a valve-vault entry, and the atmospheric monitor alarms at 11.6% oxygen. The attendant remains outside. The entrant is attached to the planned retrieval system, the retrieval path is unobstructed, and the attendant is trained to recover the entrant without entering. What is the appropriate emergency response?

Show answer & explanation

Correct answer: D - Activate the designated rescue service and promptly retrieve the entrant without entering.

Domain 6: Utah Code Amendments

Question 9

A Utah plumbing company had six employees throughout the preceding year. One employee suffers a work-related forearm fracture that requires treatment but not hospital admission. The owner knows of the injury immediately and notifies the workers' compensation insurer. Which separate obligation still applies?

Show answer & explanation

Correct answer: A - Make a separate report of the fracture to UOSH within eight hours of its occurrence.

Domain 7: Safety

Question 10

A Utah residential boiler's closed loop contains water treated with a corrosion inhibitor. Its proposed potable makeup connection uses a backflow preventer with an intermediate atmospheric vent. The designer relies on the residential-boiler exception. Which revision provides an acceptable form of protection under Utah's amended IPC?

Show answer & explanation

Correct answer: A - Replace the device with a listed reduced-pressure-principle backflow assembly.